Quakertown High School

Large-scale renovations and additions to existing high school. Significant phasing challenges. Four-year construction timeframe; school fully occupied and operational throughout construction.

Tags

 

Architect

 

Location

Quakertown, PA

 

Year Completed

Northside Commons

100,000 square foot masonry load bearing dormitory building with concrete plank floor and roof structure. Design was completed on a fast track within two months.

Read More »

Highland Haus

Project consisted of five levels of residential wood framing on top of two concrete levels of parking and street-level retail space. The residential space provided

Read More »